MainPage » » Engine Overhaul 1994 Mitsubishi Expo LRV

Engine Overhaul 1994 Mitsubishi Expo LRV

 Engine Overhaul 1994 Mitsubishi Expo LRVFirst Remove radiator shroud, cooling fan and pulley. Remove all drive belts and crankshaft pulleys. remove
Upper timing belt covers and gaskets. Note bolt length and location.

Caution: Do not turn the crankshaft (counterclockwise as of the date indicated
Main belt that) at the end of the engine. If timing belt is to be reused, mark the direction
Rotation before removing.
Second Remove the crankshaft sprocket bolt and washer. Turn clockwise (as of crankshaft timing belt
End of the engine) to the No. 1 cylinder is at TDC compression stroke. Align timing marks on camshaft
Pinion with Mark on the cylinder head. See Figure 5
(3) Loosen. Time belt tensioner adjustment bolt, and move tensioner toward water pump Bolt to tighten
safe release. Remove the front timing belt and tensioner. After timing belt has not rotate crankshaft
were removed.
4th Remove camshaft sprocket (if necessary). Cylinder block oil pump sprocket access plug removed.
See Figure 4 Inserting a. 31? (8.0 mm) diameter Phillips screwdriver to block left silent shaft.
5th Remove oil pump sprocket nut and remove sprocket. Remove front crankshaft sprocket and flange. hint
Direction, and the installation sequence for reassembly reference.
6th Remove rear belt tensioner assembly time. Remove the rear timing belt. Remove right silent shaft sprocket
with a spacer (if necessary). Remove the rear sprocket with crankshaft key.

Posted in . Bookmark the permalink. RSS feed for this post.
Powered by Blogger.

Search